Project

Mechanized Bridge

It is a bicable bidirectional type of ropeway technology operates under motor power design and builds by the engineers of Nepal using locally available materials. The system is installed as prototype for human transportation connecting Kotre, Tanahun and Punditar, Kaski over Seti River having 520m with 25m level difference. At that section, numerous efforts of bridge construction was in vain due to technical infeasibility. So ropeway technology for river crossing is the best at such long span. The technology is also economical considering construction as well as operation cost for the span greater than 450 meters



Mechanized Bridge (River Crossing Passenger Ropeway)


It is a bicable bidirectional type of ropeway technology operates under motor power design and builds by the engineers of Nepal using locally available materials. The system is installed as prototype for human transportation connecting Kotre, Tanahun and Punditar, Kaski over Seti River having 520m with 25m level difference. At that section, numerous efforts of bridge construction was in vain due to technical infeasibility. So ropeway technology for river crossing is the best at such long span. The technology is also economical considering construction as well as operation cost for the span greater than 450 meters.

 
Technical Brief

Type                       :      Bi-Cable Bi-directional

Stage                      :      Two or more

Sheave Arrangement :      Single Drive Sheave

                             :      Two turn sheave

Cable

Track Cable              :      Steel Core (Design Based)

Hauling Cable            :      Fiber Core (Design Based)

Adjustment System   :      Fixed Anchorage Type

No. of Trolleys          :      1 in each direction (fixed with rope)

Powering Source       :      Potential energy of loaded mass at upper station

Velocity                   :      2-3 m/sec

Factor of Safety       :      >4 for cable

Control System         :      Automatic Control System with sensor provided

Trolley

Nos. of Trolley          :      2

Trolley Capacity        :      4-8 persons/ trolley

 

Justification

 

With the tools so developed over the years and rationalization of different technology might not be suitable at every place of the country. The technology should be so well chosen that that ease the life of the people. According to the users of mechanized bridge, the technology is very beneficial for the people of Punditar. It costs about Rs. 6000-6500 per meter and as if compare to suspension trail bridge the cost as about 50,000- 60,000 per meter. In respect of construction period, it needs less time than that for trail bridge construction. As in Nepal, we have lots of such obstacles; we believe that replication of such project ease the pain of extra traveling.

 